The Wave is coming. Who's tracking the first tonne?
$5.5 billion. 19 kilometres of new rail through largely undeveloped land. Contracts signed. The time to track the dirt is before the first bucket goes in.
$5.5 billion. 19 kilometres of new rail through largely undeveloped land. Contracts signed. The time to track the dirt is before the first bucket goes in.