Under the harbour, who's counting the sandstone?
Western Harbour Tunnel skips the dredging and puts Country on the machines. Credit. Now, where does every tonne of sandstone go?
Bury the pipe. Not the paper trail.
Gold Coast is boring a 1.4 km sewer tunnel 30 m under the Broadwater. Smart engineering. Now, where does the spoil go?
PFAS doesn't care about your program
The West Gate Tunnel sat idle for around two years over PFAS spoil nobody could prove anything about. The rules are tighter now. Is the tracking?
The Wave is coming. Who's tracking the first tonne?
$5.5 billion. 19 kilometres of new rail through largely undeveloped land. Contracts signed. The time to track the dirt is before the first bucket goes in.
Sydney just dug 14.7 million tonnes. Where is it now?
128 kilometres of tunnels. 19 boring machines. 14.7 million tonnes excavated. A huge engineering win. So where did all the dirt go, and who can prove it?